Home    |    About us    |    Careers   |    Contact us    |    FTP

     Your right track to reliable supplier.
 
Project ManagementRFQProjectService Commitment
Mold MakingMold Making ProcedureMold DesignPlastic Molds ShowMold Making Equipment
Injection MoldingInjection Equipment List
Die CastingDie Casting Molds ShowDie Casting Parts ShowDie Casting Equipment List
Other ServicesProduct DesignReverse EngineeringStamping DiePrototype
Quality
Two-shot & Overmolding Die Casting Part Auto part Safety Product Household Product Precision Product Communication Product Office Supplies Sample Show Room
Project Management
RFQ
Project
Service Commitment

Tel: 0755-85272260
Fax: 0755-29307648

1. An assessment will be made on customer’s project. If the project is complex, a series of engineering analysis will be carried out to customer’s part drawing, including part & mold structure analysis and Moldflow analysis etc. Through analysis the disfigurement on part design can be discovered, and propose on improvement, or send modified drawing for customer’s confirmation.

2. Start 2D mold layout design. Normally it takes 3~7 days to complete,  and
Wemade project team will have one day to have an inner design checking and improving before sending the mold layout to customer.
 
3.
Wemade project team will modify the mold layout after received customer’s comments, till approval on the final design.

4. If customer need to review complete 3D mold drawing, please propose it upon placing the order,
Wemade project team will start 3D mold design based on the confirmed 2D mold drawing, normally it takes 3~7 days to complete the 3D mold design.
 
5. Delivery time will be counted upon final product drawing provided and mold drawing approved,
Wemade will start ordering steel and mold base and processing.

6. The project engineer will send customer a timing plan of the machining 3 days after mold drawing approval. Only after mold drawing approved, 
Wemade can start the mold making, and from then a weekly report with live pictures will be sent to customer every Monday. 
 
7. 
Wemade will finished T1 within designated delivery time and record the molding condition of T1(the first trial), take pictures and video of the process. After T1, Wemade will send customer samples, meanwhile a inspection report will be provided within 5 days.
 
8. After T1,
Wemade will improve the mold according to inner review and any feedback from customer. Latest samples and inspection report of T2 will be sent to customer for approval.
 
9. Once customer approved the samples (the construction is all ok, and confirmed there will have no modifications) through signed samples or written confirmation, then 
Wemade can do surface treatment. Afterwards, new samples will be sent to customer for viewing and approval.
 
10. Upon receiving customer’s final confirmation on the sample.

1: If the mold is going to stay in Wemade workshop for further production, we will preserve it for free and wait for customer’s production order. 

2: If the mold is going to be exported or moved to others for mass production, we will have final mold checking according to the mold drawing. Trial it again, the mold will be running at least 2 hours without stop, in order to make sure a successful running for future production. These will take about 10 days to complete.

11. After received customer’s final payment,
Wemade will arrange the delivery of mold. Following documentation will be provided together with mold shipment: material certificate of core/cavity and mold base, heat treatment report(for harden steel only); one CD with all 2D and 3D data; molding processing data & sample inspection report from final mold trial.

 

 